NATIONWIDE EQUIPMENT SALESEQUIPMENT LISTJUSTIFY THE COSTNEW VS. USEDWARRANTY AND TRAININGWHY LEASE?SELL YOUR MACHINECONSIGN A MACHINELISTA DE EQUIPOSREQUEST A MACHINE
NATIONWIDE EQUIPMENT SALES 800.321.0486
ABOUT USREFERENCESHOMELINKSCONTACT US
 6210 Hackers Bend Ct • Suite D • Winston-Salem • North Carolina • 27103

12-POINT INSPECTION

Inspect and repair light assembly.

 

Inspect and repair thread stand including replacing missing eyelets, thread holders and repairing damaged tension assemblies.

 

Upper tension tree inspection, which includes replacing worn check springs, thread break posts and missing or cracked eyelets. Inspect head boards for correct dip switch settings and check for loose connections.

 

Head repair and inspection, which includes removing all head covers and replacing worn drivers, fixing bases, take-up levers, connecting links and drive shafts. Replacing all O-rings, needles, hooks and trimmer blades. Replacing all worn needle bars, springs and throat plates. Inspect and replace worn needle bar felts and thread clamp assemblies. Inspect gears for proper mesh and lubrication. Replace missing gear covers. Inspect and lubricate shaft bushings. Inspect all solenoid assemblies.

 

Inspect main motor and pantograph motors.

 

Disassemble pantograph and replace worn bushings and guide rails. Inspect metal guide rails and bearing packs for proper alignment. Inspect and replace missing or worn felt on pantograph. Replace worn upper bushings and guide rails.

 

Inspect drop table assembly for proper working order, when applicable.

 

Clean driver box and check fuses. Inspect for proper power settings.

 

Update software to latest version. Check machine electronics including thread break detection, automend, start/stop switches, scaling and rotation. Make sure all solenoids are working properly, including the thread clamp and trimming solenoids.

 

Sew machine, using a 26,000-stitch design, which utilizes all the various stitches, stitch directions and all color changes. For machine to pass inspection it should sew this design with no more than 1 thread break per head.

 

Clean machine thoroughly and lubricate all factory prescribed points.

 

Pack all machine accessories, bubble wrap automat, cover machine with plastic sheeting and shrink- wrap entire machine.

Liventus Designs

Copyright 2002
NATIONWIDE CAPITAL CORPORATIONTHE EMBROIDERY STOREFREE EMBROIDERY STUFF